Appletree -Requirements
 
How do I determine which machine is Needed?
1- Define the areas that require cleaning
2- Define area where a machine could traverse
3- Decide what are the movements needed
4- Calculate the distance free from the center of the machine to furthest area to reach
5- Determine the available space for the machine to travel
6- Locate posible obstacles and allow for space behind the machine
7- Consider safe access to the roof and machine
8- Specify fall arrest system if aplicable
 
Other topics on cradles tender packages are………
Electrical plugs, every 40m at least, 3 phases, earth, 16A
Pins & sockets, on the façade at the height of 40m, and every 20m
Typical plinth have to be waterproof and properly located, specially on bends
Standard color is Ral 9007 which is dark gray. (we can paint in any other color)
Crane, we need to know the load capacity and need to be available
Loads & reactions need to be taken in care on the building structure
Our cradle is 2 m length, 240 kgr and 2 people as an standard. Other sizes on request
 
 